Project Management Services

Updated October 2026

Oddtoe’s project management services take a build from signed-off design to finished piece on the venue floor: the makers, the schedule, the freight and the progress reports. One person is accountable from the first drawing to the day it goes up.

The short version

What does project management for a build actually involve?

Project management for a built piece means holding the schedule between the design and the venue. Someone briefs the makers, checks the work against the drawings, books the freight and tells you where things stand. Oddtoe does that alongside the design, so the person managing the build is the person who drew it.

Oddtoe is an experiential design and generative-AI animation studio based in Melbourne, creating projection, installation, and animated work for events, venues, and galleries.

The question behind the question

What changes the cost of managing a build?

Four things: the number of makers, the length of the schedule, how many countries the piece crosses, and how many approvals it needs before it can be made.

Each extra maker adds a conversation, a delivery date and a chance for something to arrive late. A piece built by one workshop is a different job from one with a fabricator, a printer and a costume maker, each working to the same opening night.

Crossing borders adds freight, customs and sometimes treatment or certification for the materials. Those are manageable when they are planned in the first week and expensive when they are discovered at the dock.

Approvals matter more than people expect. Every sign-off from a client, a venue or a licensor is a day the schedule can lose. Oddtoe scopes the job once it has seen the files and the date rather than quoting a generic rate — send the brief and a real person answers.


Questions & Answers

project management services

It covers the schedule, the makers, the freight and the reporting between a signed-off design and a finished piece on the venue floor. Oddtoe briefs the makers, checks the work against the drawings, sends visual progress reports, and hands over to the install with one person accountable.

Yes. Makers in Asia sit in nearly the same time zone and hemisphere, so a question to the maker rarely waits overnight, and Oddtoe deals with them directly. Freight and customs are worked through with a freight agent as part of the job, including anything the materials need on the way in.

Oddtoe, designer and project manager does not publish prices. Cost depends on how many makers are involved, how long the schedule runs, how many countries the piece crosses and how many approvals it needs. Send the date and the files through the contact page and you get a quote.

Yes. When the design comes from another agency, I first redraw it as build drawings for the makers, then manage the build from those. Calls with European and American teams happen in their working day. The full process is on the campaign in Australia page.

Because of distance, time zones and local rules. Sydney and Melbourne are 13 to 27 hours by air from the main overseas hubs and 6 to 19 hours ahead of them, so questions wait a night. Oddtoe manages the build locally, in your working day, and sends visual progress reports against the drawings at each stage.


A project coming together, from drawing to finished structure.


What gets managed

What kinds of builds does Oddtoe project-manage?

Pieces that have to be made by someone else from drawings: an installation, an inflatable, a costumed character, a set of props, or the Australian build of a piece designed overseas. The common thread is a design, a date, and one or more makers who need managing.

Each kind of build has its own page. See installations, inflatables, mascots and costumed characters and props for how the design side works.

If the piece is arriving from another country’s files, the campaign in Australia page walks through the whole job, from the files to the venue. For the day itself, see event management.


Why overseas teams struggle

Why is managing a build for Australia hard from overseas?

Three things: distance, time zones and local rules. Sydney and Melbourne are 13 to 27 hours by air from the main overseas hubs and 6 to 19 hours ahead of them, so a question to a maker or a venue can wait a night for its answer.

Distance and time. Los Angeles to Sydney is about 14 hours non-stop, and Dubai to Melbourne is about 13 hours. London is about 21 hours in the air with a stop, Paris 21 to 27 hours depending on the connection, and New York more than 21 hours with a stop. Sydney and Melbourne run 6 to 19 hours ahead of those cities, depending on daylight saving, so the working days overlap by an hour or two at best. Most questions wait for the next morning.

Rules. Timber and wood packaging must meet biosecurity import conditions. A visitor visa does not allow work in Australia, and installing a piece is usually work, so an overseas crew should check the visa rules before booking flights. Rigging, scaffolding and crane work needs a licensed operator.

Small things. Phones either roam on a daily pass or need a local SIM or eSIM, and the venue manager, the freight agent and the loading dock all ring local numbers. The seasons are reversed too, so an October opening here is a spring one.

What Oddtoe does about it. Oddtoe is already here: a local number, local crews licensed where the job needs it, and calls in your working day. Makers in Asia are in nearly the same time zone, and visual progress reports mean nothing waits on an overnight reply.


Where the schedule actually starts

Inside a project management brief

I ask for the delivery date and the design files before anything else. The date fixes the schedule, and the files tell me what the makers will need to see. If the files are a render and not a drawing, that is the first job, because makers cannot build from a picture.

I have managed hundreds of client projects through the Datalabs Agency, a data visualisation studio, from the brief to the delivery. The schedule, the approvals and the handover are routine work to me.

Then I want to know who has to approve what. A client, a venue and a licensor each have their own say, and each says it at a different time. I put every approval on the schedule at the start, so none of them arrives as a surprise.

Time zones are part of the job. I take calls with European and American agencies in their own working day, and fabricators in Asia are in nearly the same time zone and the same hemisphere, so a question to the maker rarely waits overnight. I know the venues in Sydney, Melbourne and Brisbane, so the build is planned for the room it ends up in.

I give you one number to ring and visual progress reports as the work goes. A photograph of the piece at each stage tells you more than a status email.



The problems of managing a build from overseas

Who should manage the build for Australia?

A build for Australia needs makers, approvals, freight and a schedule held together across time zones. This table shows how each team deals with them.

  Your own producer, from overseas A production company Oddtoe, designer and project manager
Who protects the design through the build? Your producer, who may not be a maker. A team working from your brief, not your drawings. Oddtoe redraws the design for the makers and checks the work against it.
Who talks to the makers? Your producer, across time zones. The company’s own suppliers, not your choice. Oddtoe, directly, including makers in nearby Asian time zones.
Who plans for approvals and the venue? You do. Venues and councils ask for local paperwork. It depends on the contract. Oddtoe puts the approvals into the schedule from the first week.
Who clears customs and biosecurity? You do. Packaging is checked at the border. Not usually part of the job. Oddtoe builds locally, so only the files cross the border.
Who reports on progress? Updates from another time zone. A status report. Photographs of the work against the drawings, at each stage.
What happens when the schedule slips? It is found when the piece ships. It is reported through the account manager. You hear when it happens, with a new plan.
What do you need to provide? Your producer’s time, in another time zone. A full brief and a budget. The date and the design files, early.

Oddtoe quotes each job after a scoping conversation. The makers, the schedule and the freight decide the price.


What to send when you brief a build

How to brief a project management job

Send the delivery date and the design files first, even if the files are unfinished. Say where the piece is going and who has to sign it off, because that decides the order of the schedule.

Tell me who the makers are, if you already have some. If they are in another country, say which one. If you have none, I will say who I would use and why, and you can decide whether to take that advice.

Share the constraints you already have: a budget ceiling, a venue’s loading hours, a date the press has been told, a material your client has ruled out. They narrow the schedule quickly and save a round of revisions later.

If you are not sure how much of the build you need managed, say that too. Send the brief through the contact page and I will tell you honestly which parts I would take on and which are better with someone else.